Tuesday, September 15, 2015

Announcing the Crossover Series of Robbins TBMs


Dual Mode Machines bridge the gap in Mixed Ground

                                                                 
The Robbins Crossover Series of TBMs includes the XRE (Rock/EPB) machine, a TBM type that recently completed swift tunneling at Australia’s Grosvenor Decline project.

                                         
Robbins proudly announces its Crossover Series of TBMs, a line of field-tested, rugged Dual Mode-type machines.  Crossover TBMs feature aspects of two TBM types, and are ideal for mixed ground conditions that might otherwise require multiple tunneling machines.  The XRE (standing for Crossover Rock /EPB) is the most common type of hybrid machine, and features characteristics of Single Shield Hard Rock machines and EPBs for efficient excavation in mixed soils with rock.  An XRE TBM recently completed tunneling at Australia’s Grosvenor Decline Tunnel, where it excavated two mine access drives at rates fourteen times faster than a traditional roadheader.  The latest drive was completed on February 9, 2015. “This was a big step forward for the mine to appropriately use civil tunneling technology for a mining application. I take my hat off to the management of owner Anglo American Coal to have the foresight and leadership ability to take this step. Using the Crossover technology [versus the traditionally-used roadheader method], the project was finished on schedule,” said Lok Home, Robbins President.

Additional types of Crossover machines include the XSE (Crossover between Slurry/EPB) and the XRS (Crossover between Rock/Slurry) TBMs.  The Crossover series is quickly gaining in popularity, with Robbins Crossover TBMs currently being assembled in Mexico, Turkey, and Azerbaijan.  An XRE TBM will begin excavation for Mexico’s Túnel Emisor Poniente II (TEP II) later this year, while an XSE is being readied for excavation at the Baku Metro.
 
The Robbins Crossover (XRE) TBM pictured here is at the forefront of a trend for efficient machines that can operate in mixed ground conditions.
The rebranding and Crossover terminology embodies the concept that the machines are able to cross over between modes, says Home. The unique machines are a top focus point for the company: “Robbins comes at this business with extensive rock experience so everything we design comes with the assumption that there will be tough conditions. When you have to “cross over” to another mode then already you are in difficult conditions, and contractors need robust machines to get through these challenges,” says Home. 

Home foresees that machine sales will grow as more projects worldwide are planned in difficult and varying ground conditions. Survey results back up the trend, indicating an increased interest in Crossover-type machines worldwide. “This is a continuous evolution and we are consistently endeavoring to improve Crossover designs. We have three of the machines in production now and I see this number increasing year by year as the industry sees and accepts their value.”

Saturday, August 22, 2015

Robbins teams up to bring Embattled TBM back to Life



Small Siphon Tunnel overcomes Long Odds in NYC




The EPB, originally manufactured by CAT, was launched in August 2012 for the Tully/OHL JV




On January 28, 2015, about 35 m (115 ft) below New York Bay, a celebration was underway.  Workers from the local tunnelers union in New York City, USA, known as the Sandhogs, completed the last meters of tunnel alongside workers for subcontractor Tully/OHL and Robbins field service.  The team had many reasons to celebrate—not only had their TBM just completed a much-needed undersea tunnel, but it had also done so after a near-catastrophic natural disaster, extensive rebuild and geologic complications.

The New York City Harbor Siphons Project began simply enough—the 2.9 km (1.8 mi) long tunnel between Brooklyn and Staten Island was designed to replace two existing shallow water lines below the bay.  The project, managed by the New York City Economic Development Corporation (NYCEDC), replaces the lines with the deeper siphon in order to make way for a larger project—the dredging of the Anchorage Channel. The channel (part of New York Bay) is an important waterway for shipping, and its dredging will allow for mega ships carrying large cargo loads to pass through.

Tully/OHL USA JV procured a 3.8 m (12.5 ft) diameter EPB TBM from Caterpillar in 2012.  The TBM, dubbed “Pat”, was designed to drive through highly variable clays, sands, weathered rock and boulders. It was launched from the 35 m (115 ft) deep Staten Island shaft, boring towards the 40 m (131 ft) deep Brooklyn shaft, in August 2012.

The Robbins Field Service crew worked to bring a flood-stricken EPB back online at the Harbor Siphons project, which completed tunneling in January 2015.
 
In October 2012, the unexpected happened: a massive hurricane, dubbed Superstorm Sandy, barreled down on the U.S. East Coast with winds up to 145 kph (90 mph).  Extreme flooding at the waterfront jobsite in Staten Island overtopped protective concrete barriers that had been designed three feet above the 100-year flood level.  Seawater rushed into the tunnel and the nearly 113 m (370 ft) long machine was entirely submerged only 460 m (1,500 ft) into its drive. “Obviously this was our biggest challenge,” said Luis Alonso, Tunnel Manager for OHL. “After that, not many people thought we would be able to finish this tunnel.”

After floodwaters began to recede, OHL set about determining the extent of damage on the machine. The TBM was severely corroded by saltwater and sat idle until July 2013. During that time, CAT announced its impending closure of its TBM business, and the contractor looked to other manufacturers. “OHL was always determined to finish this project.  After studying other options, we decided to proceed with the full refurbishment of the TBM with the help of The Robbins Company. The whole crew worked together to achieve that goal,” said Alonso.

The Robbins Field Service Team replaced all electronics systems, rebuilding much of the CAT-manufactured EPB from scratch
 
Robbins coordinated the effort to replace corroded hydraulic components and all new electrical systems in mid-December 2013.  Electrical systems had to be reverse-engineered, while the PLC had to be entirely redesigned. The refurbishment also centered on removing the rear eleven gantries and belt conveyor to be cleaned, evaluated and repaired. The rebuild took about four months, much of it done in the tunnel under water pressure, and crews were able to return to mining on April 14, 2014. 

To ensure that the project stayed on the incline to success, Robbins Field Service personnel remained onsite to support ongoing maintenance of the TBM. With their help, machine performance steadily increased, eventually reaching rates as high as 30.48 m (100 ft) per day and as much as 25 rings in 24 hours in August 2014.

Workers from the local tunnelers union, known as the Sandhogs, celebrate as the EPB breaks into the slurry wall of the exit shaft
 
As excavation picked up, ground conditions changed from marine sediments (clay, silt and sand) to glacial geology with sand, exceptionally hard boulders, and excessive water ingress, resulting in slow propulsion rates. “The TBM needed more thrust and we decided to implement four additional auxiliary cylinders. Robbins field service helped in developing the size, features and location of the cylinders, which were eventually placed in the lower quadrant of the propulsion system,” said Alonso. With the new system crews were able to re-establish forward progress. The constant hurdles continued into early October when a hyperbaric intervention at 4 bar of pressure was required to change the cutting tools in a pocket of glacial soils. Despite the new obstacles, the crew was able to steadily increase the rate of excavation to 5 to 7 rings per day. 

“This tunnel is an important part of a larger project, and we are proud to be doing what we do every day, dealing with troubles as they come up, until we reach the end of the drive,” said Alonso.  Now that tunneling is complete, the stationary and tail shields will be buried at the exit shaft entrance, with the cutterhead and back-up being removed. 
 



The successful project overcame multiple obstacles—flooding at the harbor-side jobsite overtook 100-year flood barriers and submerged the machine in 2012

Thursday, December 29, 2011

1.2 Km long Microtunnel with 2.5 m dia for LNG Project

Theiss an EPC (Engineering, Procurement and Construction) Company has been awarded AU$60 million tunnelling contract by Chevron's Wheatstone project, Western Australia.
 


Thiess announced that it would build a tunnel of 1.2 km in length, which passess under the ocean connecting two offshore gas reserves with the Wheatstone's LNG plant. The 1.2 km long microtunnel will have a diameter of 2.5m which will accomodate a 1.1m dia pipe line to transport gas from Wheatstone and Lago reserves.


                      The engineering, procurement and construction  of the tunnel boring machine shaft, jacking pipes and tunnel boring machine retrieval pit will commence shortly, but the onsite construction will only start by beginning of 2013, shortly after the cyclone season.
                      The project also create a lot of employment directly and indirectly involving lot of suppliers and sub contractors

Sunday, December 25, 2011

Merry Christmas - New Job opening in Hydrotech Engineering L.L.C


New Job opening in Hydrotech Engineering L.L.C
Operations Manager Drilling/Microtunneling
Contract type          - Permanent
Market sector         - Construction / Mining
Country                    - Outside Europe 
Location                   - Dubai
Description: Hydrotech Engineering L.L.C is an established contractor in United Arab Emirates, currently recruiting an OPERATIONS MANAGER (Preferably European) with a background in Directional Drilling, Thrust Boring and Microtunneling, an individual with a very strong history within main contracting, a minimum of 15 years experience in operational positions. A qualified engineer, with an excellent grasp on the technical aspects of Trenchless technology, having strong leadership and communication skills are a pre-requisite as is the ability to build and motivate a team. If you are looking for a new challenge and have the relevant experience please forward a copy of your CV for consideration at jobs@hydrotechuae.com & jawad@hydrotechuae.com
Expires on January 14, 2012.
An EU passport or work permit is required for this position. Applicants without one of these will be rejected automatically.
Courtesy :- http://microtunnelingindia.blogspot.com

Monday, December 19, 2011

B06 Micro Borer - The new competitor for piercing tools


B06 Micro Borer - The new competitor for piercing tools

Replace those inaccurate pneumatic piercing tools like Grundomat
The machine is capable of installing cables, conduits and pipes up to 200 mm in diameter. All tooling are included for back reaming up to 20m long in clay & sand. This machine is the perfect alternative to the weak moles in clay and mixed ground conditions where these impact tools will miss the target or pop up in the middle of the road.

Light Weight drill rig with real power
This unique machine gives contractors the versatility of a small light weight drill rig combined with real power. You can even use the hydraulic system of your mini excavator as the whole system.

Go where the other cannot
This unit is 1.75m in length and only 0.46m wide. This allows access to backyards throught normal household doors where the conventional rigs can't go.

Use it as a directional drill rig as well
The Micro Borer B06 can also be configured as a micro directional drill rig with its own directional drilling blades, transmitter housing and Digitrak SE locator. It can even be fitted with an air hammer to drill through solid rock.

Very popular in the cable laying & plumbing industry
The engineered simplicity and versatility make this rig an ideal tool for electricians involve in the NBN for example, telecommunication cable and fiber optic, plumbers and any other contractors associated with trenchless installation of small underground services.

Courtesy:-www.nodigequipment.com

Wednesday, December 14, 2011

Courses offered by IndSTT Trenchless Foundation Program- Microtunneling


Courses offered by IndSTT
Trenchless Foundation Program- Microtunneling
Trenchless Foundation-Microtunneling Program has been divided in three levels, Basic, Intermediate & Advanced. 
Course coverage of each level is as follows:
 Basic Course—It co vers Basic of Microtunneling Methods, Survey and Investigation for Microtunneling Projects, Drilling fluids & Subsurface Utility Engineering.
 Intermediate Course—It covers Microtunneling Operations, Equipment Selection for Microtunneling Projects, Project Design for Microtunneling Projects and Site Supervision for Microtunneling Projects.
 Advanced Course—It Covers Jacking and Receiving Shaft, Laser Guidance System/Laser and Jacking Frame Setup, Jacking Pipe Design, Shaft Design and Pricing and Cost Control.

Basic level Course synopsis
1. Basic of Microtunneling Methods
2. Survey and Investigation for Microtunneling Projects
3. Drilling Fluids
4. Subsurface Utility Engineering
Basic Level Course Contents
1. Basic of Microtunneling Methods  - Description of microtunneling methods, technique    background, spoil removal and line & grade management.
2. Survey and Investigation for Microtunneling Projects  - Basic Consideration for carrying 
out survey and geotechnical investigation, data interpretation evaluation and planning of the 
project including mapping and subsurface exploration.
3. Drilling Fluids  - Introduction of drilling fluids, development of technology, equipment and procedures.
4. Subsurface Utility Engineering  - Introduction, components, site assessment, data management and conclusion for microtunneling project execution.
Course Eligibility
Diploma in Engineering with 2 years experience or Degree in any branch of Engineering.


Intermediate level Course synopsis
1. Microtunneling Operation
2. Equipment Selection
3. Project Design for Microtunneling Project
4. Site Supervision for Microtunneling Projects
Intermediate Level Course Contents
1. Microtunneling Operation  - Machine set up, Jacking and receiving shaft, Jacking operation, 
    and Slurry removal.
2. Equipment Selection  - It covers the guidelines that need to be followed in making choice of 
     the machine and their attachments. The equipment also needs to perform at its best.  
3. Project Design for Microtunneling Projects  - Alignment considerations, cover requirements,                         design grade, product pipe requirements, casing requirements, line and grade tolerance.
4. Site Supervision for Microtunneling Projects  - Construction monitoring requirements relative     to microtunneling including job site safety, pre-construction surveys, pipe materials testing,   microtunneling operations and instrumentation provisions.
Course Eligibility
Successful completion of Microtunneling Basic Foundation Course.


Advanced level Course synopsis
1. Jacking and Receiving Shaft
2. Laser Guidance System/Laser and Jacking Frame Set Up
3. Jacking Pipe Design, Shaft Design
4. Pricing and Cost Control
Advanced Level Course Contents
1. Jacking and Receiving Shaft  - Design of launching and receiving shaft, thrust wall, ground 
condition and jacking frame set up.
2. Laser Guidance System/Laser and Jacking Frame Set up  - Fitting the laser guidance system, laser cheeks, steering setting laser beam with directional setting into the axis etc.
3. Jacking Pipe Design, Shaft Design  - General methodology of pipe design and about RCC 
pipes with or without lining, steel pipes, polycrete pipe.
4. Pricing and Cost Control  - Various inputs to complete the cost estimate, production rate depending on ground condition and other factors that will influence the cost.
Course Eligibility
Successful completion of Microtunneling Intermediate Foundation Course.


Batch Strength
  •  Maximum batch strength shall be 35 participants.
  •  Minimum batch strength shall be 10 participants. 
In case of lesser registrations, the particular batch may be merged with the subsequent batches.


For furthur queries contact
Prof. Niranjan Swarup
Executive Director
Indian Society for Trenchless Technology (IndSTT)
908, Hemkunt Chambers, 89, Nehru Place, New Delhi –110019 INDIA
Phone: +91-11-41617862 Fax: +91-11-41617863 Mobile: + 91-9811499248
Email: indstt@indstt.org, indstt@indstt.com 
Courtesy to :- www.indstt.com, www.indstt.org, www.indianodig.com, www.indstt.in



Sunday, December 11, 2011

Indian Society for Trenchless Technology(IndSTT) - A pioneer in Trenchless Foundation in India - Offering fasttrack courses for Microtunneling


IndSTT was found in 1995 in order to provide expert advice and feedback on relevant areas related to trenchless technology. The most popular trenchless technology is Microtunneling which is widely used in order to accomplish projects world wide. Microtunneling helps in laying pipe lines without digging trenches and thus enables to carry out projects in the middle of the city, under the buildings without disrupting the public traffic, which saves a lot of time and struggle.
                                    IndSTT  has launched Microtunneling foundation courses  inorder to provide founding knowledge of essential topics required for Microtunneling technique. The program has an architecture for providing the candidates with Basic, Intermediate and Advanced courses.
The knowledge acquired through this program along with the relevant work experience will back the candidate with , a solid base on how to carry out and complete a whole project.


Why?
                The trenchless technology due to its limited domain in the industry results in lack of expert professionals readily available world wide. This leads to delaying of projects until the expert workforce is avilable or leads in placing untrained personnel in the projects compromising the quality of the job.
At present the current strength of microtunneling professionals doesn't  commensurate with the ongoing and upcoming projects demands for trained professionals. This has led IndSTT to initiate  fast track Trenchless professional courses in various Trenchless Technology techniques titled Trenchless Foundation Program.